9-14-2022 8:38am
Construction on Speedwell Ave has been completed and the roadway is open in both directions.
I disagree with this
This is unverified
Spam
Offensive
Ongoing construction on Speedwell Ave near Cutler St. Speedwell Ave Southbound is detoured. DOT on scene to assist but use alternate routes if possible.
Construction on Speedwell Ave has been completed and the roadway is open in both directions.
Sunny, with a high of 61 and low of 39 degrees. Sunny for the morning, partly cloudy in the afternoon, clear in the evening,