Sewer Investigation Work, June 11th - Area of North Linden Ln
Beginning June 11th, 2024, representatives from Duke’s Root Control, Inc. will be in and around the area of North Linden Ln for the purpose of evaluating the condition of the sanitary sewer system. The work is expected to be completed by the end of the week.
This method of testing requires representatives from Duke’s Root Control, Inc. to access manholes located within the Right-of-Way and/or utility easements, including those on private property but within the utility easement. In addition to access to the property, Duke’s may also require the temporary use of your driveway, as it may aid in the optimal position of their camera truck and equipment. Per manhole, the inspection and installation processes should last less than 45 minutes, does not impact any operation of the sewer and there will be no disruption of service at any point. Your cooperation is greatly appreciated. All Duke’s representatives will have identification badges and will be wearing company uniforms at all times.
Please feel free to contact Duke’s Root Control, Inc. at 800-477-6687 or the Borough at 973-543-7030.