Alert
Thursday January 23 2025 3:01pm
Ongoing Road Construction in Morris County and Vicinity
Expect lane closures, shoulder closures, and possible delays on I-287, I-80, US 46, and NJ 23.
Below is the most recent update on construction projects affecting major highways in Morris County and nearby areas. Unless stated otherwise, most closures are in effect until 3:00 p.m. Motorists should allow extra travel time and consider alternate routes.
I-287 Construction
Southbound
- Exit 34 – CR 663, Morris Twp.
- Right shoulder closed until 3:00 p.m.
- Time: As of 9:00 a.m.
- Exit 37 – NJ 24, Hanover Twp.
- Right shoulder closed until 3:00 p.m.
- Time: As of 9:00 a.m.
- Exit 33 – Harter Rd/US 202, Morris Twp.
- Right shoulder closed until 3:00 p.m.
- Time: As of 9:00 a.m.
Northbound
- Exit 37 – NJ 24, Hanover Twp.
- Right shoulder closed until 3:00 p.m.
- Time: As of 9:00 a.m.
- Exit 33 – Harter Rd/US 202, Morris Twp.
- Right shoulder closed until 3:00 p.m.
- Time: As of 9:00 a.m.
- South of Exit 36 to Exit 36 – CR 510/Morris Ave, Morristown
- Right shoulder closed until 3:00 p.m.
- Time: As of 9:00 a.m.
- North of Exit 34 – CR 663, Morris Twp. to South of Exit 35 – NJ 124, Morristown
- Right shoulder closed until 3:00 p.m.
- Time: As of 9:00 a.m.
US 46 Construction
Eastbound
- From East of CR 618/Mountain Lakes Blvd, Mountain Lakes, to East of CR 654/Cherry Hill Rd, Parsippany-Troy Hills
- Acceleration lane closed until 3:00 p.m.
- Time: As of 9:00 a.m.
- From East of CR 618/Mountain Lakes Blvd to West of CR 654/Cherry Hill Rd, Mountain Lakes
- Right shoulder closed until 3:00 p.m.
- Time: As of 8:00 a.m.
Westbound
- From East of CR 654/Cherry Hill Rd, Parsippany-Troy Hills, to East of CR 618/Mountain Lakes Blvd, Mountain Lakes
- Acceleration lane closed until 3:00 p.m.
- Time: As of 9:00 a.m.
- From West of CR 654/Cherry Hill Rd to East of CR 618/Mountain Lakes Blvd, Mountain Lakes
- Right shoulder closed until 3:00 p.m.
- Time: As of 8:00 a.m.
I-80 Construction
- Westbound, Exit 30 – Howard Blvd, Mount Arlington
- All lanes shifted due to Bridges over Howard Boulevard replacement project
- Left lane shifted until further notice
- Time: As of 7:20 a.m.
NJ 23 Construction (Northern Morris/Passaic Border)
Southbound
- Between CR 618/Kinnelon Rd/Keil Rd, Butler, and South of CR 680/Jackson Ave, Pequannock Twp.
- Right shoulder closed until 4:00 p.m.
- Time: As of 7:00 a.m.
Northbound
- Between South of CR 680/Jackson Ave, Pequannock Twp., and CR 618/Kinnelon Rd/Keil Rd, Butler
- Right shoulder closed until 4:00 p.m.
- Time: As of 7:00 a.m.
Travel Tips
- Check for Detours: Lane and shoulder closures may cause slower travel speeds—plan alternate routes if possible.
- Off-Peak Travel: Delays typically subside outside of morning and afternoon rush hours.
- Monitor Updates: Follow real-time traffic reports or check the NJDOT website for the latest information.
Drive safely through work zones to ensure the safety of road crews and fellow motorists.